Portfolio
- 1. At the end of 2009 we prepared the set of documentations for conversion of the 50m vessel. The scope of project included:
- moon pool from the bottom to the main deck
- navigation mast with integral new exhaust system
- replacing of the existing crane
- stern hydraulic davit for science equipment
- 2. At the beginning of 2010 we completed the designing task of converting 40m fishing vessel into the 50m sailing ship. The scope of project included:
- reinforcement of the hull in place of masts and standing rigging attachment
- strength calculation for the masts and standing rigging
- designing masts, booms, yards, bowsprit and standing rigging
- designing sails and running rigging
- 3. In 2010 we took part in general overhaul of sailing vessel ORP “Iskra”. The scope of work:
- deflection measurement of existing masts by use photometry
- adjusting the mast to receive maximum rectilinearity
- adjusting the standing rigging to their optimum preliminary tension. This was performed by dynamometer and eigenfrequency methods.
- 4. In 2010 we took part in general overhaul of sailing vessel “Oceania”. The scope of work:
- redesigning of standing rigging
- redesigning of deck layout for new running rigging
- designing of mast’s beam for service the science measurement equipment.
- 5. In 2011 we supported the whole year the Wader Wittis company in strength analysis. Our scope of work:
- designing the transport devices for elements of offshore wind turbines
- designing the deck equipment for transport wind turbines elements
- strength analysis of all aspects wind turbines transportation
- 6. In 2012 we supported the Huisman (Holland) company in 3D modeling of drilling vessel in Nupas-Cadmatic software.
- 7. In 2012 we supported the EPG (Poland) company in preparing the documentation for offshore platform.
- 8. In 2013-2015 we supported J-Marine and TTS company in designing of movable ramps for ro-ro vessels. The scope of work:
- designing hydraulically operated movable ramps, platforms and covers
- strength calculation for ramps, platforms and covers
- 9. In 2016 we prepared working drawings for 110m sailing vessel designed by Choren Design & Consulting. The scope of work:
- masts’s foundations for all antennas and navigation equipment
- desk’s foundations for internal communication systems
- 10. In 2016 we prepared working drawings for 160m sailing vessel designed by Choren Design & Consulting. The scope of work:
- masts’ foundations for all antennas and navigation equipment
- mast’s electric cable trays
- mast’s hydraulic pipes